Project Description
BE Structural worked on the addition of a greenhouse to Kline Science Hall. The project required the analysis of an aluminum-framed structure supported by a half height masonry wall. Snowdrift from the adjacent structure required tighter spacing of frames adjacent to the existing building.
Project Details
- Date:July 6, 2015