
Milton S. Hershey School, Founder’s Hall, Air Handling Unit Replacement, Hershey, PA
Project Desciption
Due to the renovations required in portions of Founder’s Hall, new Air Handling Units needed to be installed, as well as new vent grills to allow for high outside air requirements. Structural analysis and modifications were required to accommodate the new vents and installation of the new mechanical equipment. Installations of long span lintels were designed to limit the deflection of the exterior masonry stone and to anchor the stone at the opening perimeter to the structural steel frame.
Project Starting DateJuly 6, 2015
What We Do
We use forensic structural engineering technique to assist building owners, homeowners, and business owners, as well as other architectural, engineering and construction professionals. Our project portfolio extends well beyond traditional construction and structural engineering services. We believe in sustainable design and are proud to service the solar, wind and green construction industries.